Part of the WFCA common maintenance area are 8 storm sewer drainage ponds.  Of these ponds, 7 are wet retention ponds and 1 is a dry detention pond.  

Recent improvements to the ponds include dredging and re-lining ponds 1 and 2.  In 2019 & 2020, dredging was done in Pond 3.  Bledsoe, Riggert, Cooper & James have been hired to do a design study of the ponds with a report due in early 2021.

20180502_173551.jpg
pond_fountain.jpg
20190211_144323.jpg